===================================================================================
IBM WebSphere Business Modeler Basic Version 6.0.2.1
Interim Fix 2 Readme

===================================================================================

© Copyright International Business Machines Corporation 2007. All rights reserved. 

This is an interim fix for IBM® WebSphere Business Modeler® Basic Version 6.0.2.1.


Installing the interim fix
Fixes included in this interim fix
Product notes

Installing the interim fix


Use the software update function to install WebSphere Business Modeler interim fixes.

To install the interim fix, complete the following steps:

  1. Download the 6.0.2.1-WB-ModelerBas-IF0000002.zip file.
  2. Double-click the downloaded 6.0.2.1-WB-ModelerBas-IF0000002.zip file, and extract the files into a temporary directory. The rest of these instructions assume that you extracted the files to C:\temp\.
  3. In WebSphere Business Modeler, click Help > Software Updates > Find and Install. A wizard opens.
  4. Select Search for new features to install, and click Next.
  5. On the "Update sites to visit" page, click New Local Site. The Browse for Folder window opens.
  6. In the Browse for Folder window, navigate to C:\temp\6.0.2.1-WB-ModelerBas-IF0000002, and click OK. You return to the wizard, and the site that you specified is included in the Sites to include in search list.
  7. Select the site that you just added.
  8. On the Search Results page, click Select All to select both the product and the documentation features.
  9. On the Feature License page, read the license agreement for the feature that you are installing. To accept the agreement, click I accept the terms in the license agreement.
  10. On the Install Location page, click Finish. During the installation, you must confirm that you want to install an unsigned feature.
  11. When you are asked if you want to restart the workbench, click Yes.

The interim fix is now installed.

Fixes included in this interim fix

This is a cumulative interim fix for WebSphere Business Modeler Basic Version 6.0.2.1.

Fixes included in Interim Fix 2

This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.

PMR Number Related APAR Identifier Description
49208,442,000 JR26347 Adds ability to auto-layout and maintain swimlane order.

This interim fix includes the following fixes, all of which are associated with APAR JR26381.

Fixes included in Interim Fix 1

This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.

PMR Number Related APAR Identifier Description
65749,999,706 JR25993 Corrects failure to authenticate with a Publishing server when using long user ID and password combinations.
71850,033,000 JR26054 Enables scaling of SVG diagrams exported from Modeler's Process editor and embedded into a custom report.

This interim fix includes the following fixes, all of which are associated with APAR JR26169.

Product notes

Delay when testing connection to Crystal Reports server

When testing the connection to a Crystal Reports server from the Preferences page, it might take several minutes for the connection test to complete.

Delay when selecting fields for Crystal Reports report template

When creating a new Crystal Reports report template using Detailed Process Data Source as the data source, you might experience a significant delay when selecting fields to display in the report template. On the Select Fields page of the Report template wizard, if you select all available fields using the >> button, it will take several minutes for the Fields to Display list to populate.

To avoid this delay, consider individually selecting fields that you want to display using the > button instead of selecting all the available fields at once using the >> button.

Close Report Designer before deleting Crystal Reports report template

If you delete a Crystal Reports report template from the project tree while the report template is open in the Report Designer, the deletion will not complete. Even though the report template will not appear in the project tree, the associated files will not be deleted and you will not be able to create a new report template with the same name as the deleted report template.

To avoid this situation, close the Report Designer before deleting a Crystal Reports report template.