Rational ProjectConsole Designer Help
To view the properties of a scheduled task log, perform one of the following actions in the Designer navigation tree:
The items listed in the Scheduled Task Logs window are listed by date and time, with the log for task run that was started most recently at the top of the list.
The Task Log window for the scheduled task log opens in the right pane. The window contains the following controls: