In the Designer navigation tree, click Scheduled Task
Logs.
The Scheduled Task Logs window opens in
the right pane. The table in this window lists all of the existing scheduled
tasks logs.
Tip: To get a more complete view of the information
displayed, on the Designer View menu, click Navigation
Tree, and then maximize the Scheduled Task Logs window.
In the table, click the row that contains information about the
task run you want to stop.
Note: By default, the
task run in progress (or the task run most recently) is displayed in the first
row or the table.
Right-click the row, and then click Stop collection
task.
In the Task Scheduler window, you see a prompt asking
you to confirm that you want to stop the task run; click Yes.